There are three main points to consider when making a new schedule:

  • Power: if you are using a battery to power the ISUS, make sure you have enough battery capacity to cover the schedule you intend to use. The ISUS draws about 7 watts of power with the lamp turned on?
  • Memory: make sure the scheduled frequency and duration don’t create more than 256 MB of data. The ASCII full frame is 1675 bytes?
  • Lamp time: the UV lamp used in the ISUS has an effective lifetime of ~ 1000 hours. It is usually a good idea to conserve lamp hours by only collecting meaningful data?